Horsepen Bridge Progresses for Silver Line Phase 2

Capital Rail Constructors’ crews, the design build contractor Phase 2 of the Dulles Rail Project, took a major leap forward in early April with the erection of huger girders on the new Horsepen Run Bridge which will carry Silver Line trains westward.

The girders traveled by truck along Interstates 81, 66 and 495 before following the Dulles Airport Access Highway to the bridge site near Dulles Airport.

Share this Post!

Related post